Backlogs · Planning assumption
Net backlog burn rate calculator
Find how much backlog can be reduced each day. The formula is daily completion capacity − daily arrivals.
Backlogs · Planning assumption
Try the calculator
Find how much backlog can be reduced each day.
Use your active project
Upload data or load a sample in the workspace, then return here using the Calculation Library link. The project stays in memory during site navigation; a full refresh clears it. Save your private project before closing or refreshing.
ReferenceFormula
daily completion capacity − daily arrivals
Calculator inputs
Your result
- Daily backlog reductionCalculated
- 200 contacts/day
Calculator baselines and manual scenarios do not change your planning project. Related workflow: Staffing Strategy. The active project remains in browser memory during client navigation; full refresh clears it. Calculator edits stay in this page’s memory; only favourite calculator IDs are remembered in this browser. Downloads are created on your device.
How it’s calculated
Net backlog burn rate = daily completion capacity − daily arrivals
Inputs: completion capacity (contacts/day); arrivals (contacts/day). Use consistent definitions for every input.
This is a planning estimate: an aggregate figure built on assumptions that should be checked against how your operation actually runs.
Worked example
These are the calculator’s example inputs; the results below are produced by the same function that runs the calculator above.
| Input | Value | Unit |
|---|---|---|
| Completion capacity | 1200 | contacts/day |
| Arrivals | 1000 | contacts/day |
Result
- Daily backlog reduction
- 200 contacts/day
When this is wrong
- Negative means backlog grows.
- Assumes stable daily demand and completion capacity.
Related calculators
- Ending backlogEstimate the work left after arrivals and completions.
- Backlog clearance timeEstimate working days needed to clear existing backlog while handling new arrivals.
- Backlog handling workloadTranslate unresolved contacts into handling hours.
- Backlog FTE by deadlineSize an aggregate roster to handle backlog and expected new work in a deadline window.
- Backlog in completion daysExpress backlog size relative to usual daily throughput.
Definitions: metric glossary. How LoughPoint applies these methods to a full plan: methodology. All 50 calculators.