Free · no sign-in needed
Workforce planning, made simple.
Six short lessons on the numbers behind every contact-centre plan. Plain English, one worked example each, and a free calculator to check your own figures.
About 30 minutes in total. Each lesson stands on its own.
Worked example
6,000 calls a week, 5 minutes each
- Workload
- 500 h
- People needed
- 22.4 FTE
At 85% occupancy, 30% shrinkage and 37.5-hour weeks. See how in lesson 3.
Your learning path
Follow them in order, or jump to the one you need today.
- Lesson 15 min read
Demand and workload
How contacts and handle time turn into hours of work, and why intervals matter.
Start lesson 1: Demand and workload - Lesson 25 min read
Service level and waiting time
What "80% in 20 seconds" really means, and why a few extra people make a big difference.
Start lesson 2: Service level and waiting time - Lesson 36 min read
From hours to people
Occupancy, shrinkage and FTE: the three steps from workload to a headcount you can hire.
Start lesson 3: From hours to people - Lesson 45 min read
Is my forecast any good?
Measuring forecast error with WAPE, and checking that your forecast beats a simple one.
Start lesson 4: Is my forecast any good? - Lesson 55 min read
Schedules that fit the demand
Shift patterns, breaks and adherence: putting the right people on at the right time.
Start lesson 5: Schedules that fit the demand - Lesson 64 min read
Running the day
Watching the day as it happens, spotting gaps early and deciding what to move.
Start lesson 6: Running the day
The planning cycle in one picture
Every plan goes round the same five steps. What you learn on the day feeds the next forecast.
Step 1
Forecast
How many contacts, when, and how long each takes.
Step 2
Plan capacity
How many people you need, and when to hire.
Step 3
Schedule
Shifts and breaks that match the demand curve.
Step 4
Run the day
Watch service, move breaks, call in help.
Step 5
Review and learn
Compare actual with plan and feed it back into step 1.
How many people do 6,000 calls a week need?
Four steps, each one simple division. This is the monthly-planning view; for staffing each half-hour interval we use Erlang C, which you can try in the Erlang C calculator.
1. Workload
500 hours
6,000 calls × 300 seconds ÷ 3,600
2. Allow for gaps between calls
588 hours
500 ÷ 85% occupancy
3. Allow for shrinkage
840 paid hours
588 ÷ (1 − 30% shrinkage)
4. Turn hours into people
22.4 FTE
840 ÷ 37.5 hours per full-time person
A common mistake: adding 30% shrinkage by multiplying by 1.3. On 500 hours that gives 650 hours, but you actually need 500 ÷ 0.7 = 714 hours. The gap is about 1.7 full-time people.
The eight numbers every planner uses
What each one means, how it is worked out, and where to try it.
Service level
The share of contacts answered within your target time.
Answered within target ÷ contacts offered
Example: 80% answered within 20 seconds.
Try the calculator: Service levelAverage speed of answer
How long, on average, answered callers waited.
Total waiting time ÷ contacts answered
Usually quoted in seconds.
Try the calculator: Average speed of answerAverage handle time
The full time one contact takes, including the work after it.
(Talk + hold + after-contact work) ÷ contacts handled
Example: 4 min talk + 1 min wrap = 5 min.
Try the calculator: Average handle timeOccupancy
How busy people are while they are available for contacts.
Handling time ÷ (handling time + available idle time)
Very high occupancy burns people out.
Try the calculator: OccupancyShrinkage
Paid time when people cannot take contacts: leave, training, meetings, sickness.
Unavailable paid hours ÷ total paid hours
Divide by (1 − shrinkage), never multiply.
Try the calculator: ShrinkageFTE
Full-time equivalents: required hours expressed as full-time people.
Required paid hours ÷ hours in a full-time week
Two half-time people = 1 FTE.
Try the calculator: FTEForecast error (WAPE)
How far the forecast was from what actually happened, weighted by volume.
Sum of |actual − forecast| ÷ sum of actual
Actual 100, 120, 80 vs forecast 110, 100, 90 = 13.3%.
Try the calculator: Forecast error (WAPE)Adherence
Whether people did the scheduled activity at the scheduled time.
Time in the scheduled activity, on time ÷ scheduled time
Different from conformance: total hours worked vs scheduled.
Read lesson 5: Adherence
See it with real-looking data
Open the sample workspace and watch every number from these lessons worked out step by step.
