Skip to content

Free · no sign-in needed

Workforce planning, made simple.

Six short lessons on the numbers behind every contact-centre plan. Plain English, one worked example each, and a free calculator to check your own figures.

About 30 minutes in total. Each lesson stands on its own.

Worked example

6,000 calls a week, 5 minutes each

Workload
500 h
People needed
22.4 FTE

At 85% occupancy, 30% shrinkage and 37.5-hour weeks. See how in lesson 3.

Your learning path

Follow them in order, or jump to the one you need today.

  1. Lesson 15 min read

    Demand and workload

    How contacts and handle time turn into hours of work, and why intervals matter.

    Start lesson 1: Demand and workload
  2. Lesson 25 min read

    Service level and waiting time

    What "80% in 20 seconds" really means, and why a few extra people make a big difference.

    Start lesson 2: Service level and waiting time
  3. Lesson 36 min read

    From hours to people

    Occupancy, shrinkage and FTE: the three steps from workload to a headcount you can hire.

    Start lesson 3: From hours to people
  4. Lesson 45 min read

    Is my forecast any good?

    Measuring forecast error with WAPE, and checking that your forecast beats a simple one.

    Start lesson 4: Is my forecast any good?
  5. Lesson 55 min read

    Schedules that fit the demand

    Shift patterns, breaks and adherence: putting the right people on at the right time.

    Start lesson 5: Schedules that fit the demand
  6. Lesson 64 min read

    Running the day

    Watching the day as it happens, spotting gaps early and deciding what to move.

    Start lesson 6: Running the day

The planning cycle in one picture

Every plan goes round the same five steps. What you learn on the day feeds the next forecast.

  1. Step 1

    Forecast

    How many contacts, when, and how long each takes.

  2. Step 2

    Plan capacity

    How many people you need, and when to hire.

  3. Step 3

    Schedule

    Shifts and breaks that match the demand curve.

  4. Step 4

    Run the day

    Watch service, move breaks, call in help.

  5. Step 5

    Review and learn

    Compare actual with plan and feed it back into step 1.

From lesson 3

How many people do 6,000 calls a week need?

Four steps, each one simple division. This is the monthly-planning view; for staffing each half-hour interval we use Erlang C, which you can try in the Erlang C calculator.

  1. 1. Workload

    500 hours

    6,000 calls × 300 seconds ÷ 3,600

  2. 2. Allow for gaps between calls

    588 hours

    500 ÷ 85% occupancy

  3. 3. Allow for shrinkage

    840 paid hours

    588 ÷ (1 − 30% shrinkage)

  4. 4. Turn hours into people

    22.4 FTE

    840 ÷ 37.5 hours per full-time person

A common mistake: adding 30% shrinkage by multiplying by 1.3. On 500 hours that gives 650 hours, but you actually need 500 ÷ 0.7 = 714 hours. The gap is about 1.7 full-time people.

The eight numbers every planner uses

What each one means, how it is worked out, and where to try it.

  • Service level

    The share of contacts answered within your target time.

    Answered within target ÷ contacts offered

    Example: 80% answered within 20 seconds.

    Try the calculator: Service level
  • Average speed of answer

    How long, on average, answered callers waited.

    Total waiting time ÷ contacts answered

    Usually quoted in seconds.

    Try the calculator: Average speed of answer
  • Average handle time

    The full time one contact takes, including the work after it.

    (Talk + hold + after-contact work) ÷ contacts handled

    Example: 4 min talk + 1 min wrap = 5 min.

    Try the calculator: Average handle time
  • Occupancy

    How busy people are while they are available for contacts.

    Handling time ÷ (handling time + available idle time)

    Very high occupancy burns people out.

    Try the calculator: Occupancy
  • Shrinkage

    Paid time when people cannot take contacts: leave, training, meetings, sickness.

    Unavailable paid hours ÷ total paid hours

    Divide by (1 − shrinkage), never multiply.

    Try the calculator: Shrinkage
  • FTE

    Full-time equivalents: required hours expressed as full-time people.

    Required paid hours ÷ hours in a full-time week

    Two half-time people = 1 FTE.

    Try the calculator: FTE
  • Forecast error (WAPE)

    How far the forecast was from what actually happened, weighted by volume.

    Sum of |actual − forecast| ÷ sum of actual

    Actual 100, 120, 80 vs forecast 110, 100, 90 = 13.3%.

    Try the calculator: Forecast error (WAPE)
  • Adherence

    Whether people did the scheduled activity at the scheduled time.

    Time in the scheduled activity, on time ÷ scheduled time

    Different from conformance: total hours worked vs scheduled.

    Read lesson 5: Adherence

See it with real-looking data

Open the sample workspace and watch every number from these lessons worked out step by step.