Staffing & shrinkage · Planning assumption
Workload-based net FTE calculator
Find available FTE before allowing for shrinkage. The formula is workload hours ÷ (paid period hours per FTE × occupancy).
Staffing & shrinkage · Planning assumption
Try the calculator
Find available FTE before allowing for shrinkage.
Use your active project
Upload data or load a sample in the workspace, then return here using the Calculation Library link. The project stays in memory during site navigation; a full refresh clears it. Save your private project before closing or refreshing.
ReferenceFormula
workload hours ÷ (paid period hours per FTE × occupancy)
Calculator inputs
Your result
- Net FTECalculated
- 7.3529 FTE
Calculator baselines and manual scenarios do not change your planning project. Related workflow: Staffing Strategy. The active project remains in browser memory during client navigation; full refresh clears it. Calculator edits stay in this page’s memory; only favourite calculator IDs are remembered in this browser. Downloads are created on your device.
How it’s calculated
Workload-based net FTE = workload hours ÷ (paid period hours per FTE × occupancy)
Inputs: workload (hours); paid hours per FTE in this period (hours/FTE); occupancy (%). Use consistent definitions for every input.
This is a planning estimate: an aggregate figure built on assumptions that should be checked against how your operation actually runs.
Worked example
These are the calculator’s example inputs; the results below are produced by the same function that runs the calculator above.
| Input | Value | Unit |
|---|---|---|
| Workload | 1000 | hours |
| Paid hours per FTE in this period | 160 | hours/FTE |
| Occupancy | 85 | % |
Result
- Net FTE
- 7.35 FTE
When this is wrong
- An aggregate workload model; it does not guarantee live queue service or shift coverage.
Related calculators
- ShrinkageConvert an available requirement into a scheduled requirement.
- Measured shrinkageMeasure unavailable time as a share of paid time.
- Call centre staffing (FTE)Trace demand through workload, occupancy and shrinkage to roster size.
- FTE to part-time headcountTranslate FTE into people at a stated contract length.
- Headcount to FTENormalise part-time contracts into full-time equivalents.
Definitions: metric glossary. How LoughPoint applies these methods to a full plan: methodology. All 50 calculators.
