Staffing & shrinkage · Identity
Shrinkage calculator for contact centres
Shrinkage is the share of paid time when agents are not available to handle contacts. To schedule enough people, divide the agents you need available by (1 − shrinkage): at 30% shrinkage, every 70 available agents need 100 scheduled.
Staffing & shrinkage · Identity
Try the calculator
Convert an available requirement into a scheduled requirement.
Use your active project
Upload data or load a sample in the workspace, then return here using the Calculation Library link. The project stays in memory during site navigation; a full refresh clears it. Save your private project before closing or refreshing.
ReferenceFormula
net requirement ÷ (1 − shrinkage)
Calculator inputs
Your result
- Scheduled requirementCalculated
- 71.4286 same unit as input
Calculator baselines and manual scenarios do not change your planning project. Related workflow: Staffing Strategy. The active project remains in browser memory during client navigation; full refresh clears it. Calculator edits stay in this page’s memory; only favourite calculator IDs are remembered in this browser. Downloads are created on your device.
How it’s calculated
Shrinkage gross-up = net requirement ÷ (1 − shrinkage)
Gross-up: scheduled requirement = net requirement ÷ (1 − shrinkage). It is a division, not a multiplication. Adding 30% to 70 gives 91, which would leave you short of the 100 you need.
Measuring it: shrinkage = unavailable paid hours ÷ total paid hours. Use the measured shrinkage calculator with your own records rather than a figure from elsewhere.
What usually counts: paid breaks, training, coaching, team meetings, one-to-ones, sickness absence, annual leave and other paid time away from customer work. Split planned items (leave, training) from unplanned ones (sickness, other absence) so you can see which is moving.
In the UK and Ireland, annual leave and bank or public holidays are a large and predictable part of shrinkage, and leave clusters around school holidays and Christmas. A single annual average therefore understates the requirement in those weeks. Plan shrinkage by month or week where you can.
Worked example
These are the calculator’s example inputs; the results below are produced by the same function that runs the calculator above.
| Input | Value | Unit |
|---|---|---|
| Net available requirement | 50 | agents or FTE |
| Shrinkage | 30 | % |
Result
- Scheduled requirement
- 71.43 same unit as input
When this is wrong
- Apply shrinkage once. If breaks are already excluded from paid hours, or the requirement already includes shrinkage, do not add it again.
- Use one denominator. Shrinkage measured against paid hours should be applied to a paid-hours plan. Mixing items measured against scheduled time and paid time double-counts or misses time.
- Keep units consistent: interval agents gross up to scheduled interval agents; FTE grosses up to FTE.
- Unpaid time, such as an unpaid lunch, normally sits outside paid hours rather than in shrinkage.
Related calculators
- Measured shrinkageMeasure unavailable time as a share of paid time.
- Available hours after shrinkageFind time available for servicing after unavailable activities.
- Call centre staffing (FTE)Trace demand through workload, occupancy and shrinkage to roster size.
- Erlang C calculatorSize available interval agents for service and occupancy constraints.
- Workload-based net FTEFind available FTE before allowing for shrinkage.
- OccupancyMeasure occupied handling time relative to available servicing time.
Definitions: metric glossary. How LoughPoint applies these methods to a full plan: methodology. All 50 calculators.
