Staffing & shrinkage · Identity
Occupancy calculator: how busy are your agents?
Occupancy is the share of agents’ available time spent handling contacts: handling time ÷ available time × 100. It shows how busy agents were while they were available, not how much of their paid day they spent on customer work.
Staffing & shrinkage · Identity
Try the calculator
Measure occupied handling time relative to available servicing time.
Use your active project
Upload data or load a sample in the workspace, then return here using the Calculation Library link. The project stays in memory during site navigation; a full refresh clears it. Save your private project before closing or refreshing.
ReferenceFormula
handling hours ÷ available servicing hours × 100
Calculator inputs
Your result
- OccupancyCalculated
- 85 %
Calculator baselines and manual scenarios do not change your planning project. Related workflow: Staffing Strategy. The active project remains in browser memory during client navigation; full refresh clears it. Calculator edits stay in this page’s memory; only favourite calculator IDs are remembered in this browser. Downloads are created on your device.
How it’s calculated
Measured occupancy = handling hours ÷ available servicing hours × 100
Available time is time logged in and ready for, or handling, contacts: paid time after shrinkage. Dividing by total paid time instead measures utilisation, which is a different metric.
Occupancy is mostly an outcome of the queue, not a lever. For the same service target, a large team can run at higher occupancy than a small one because demand pools across more agents. Pushing a small team to the occupancy of a large one usually means missing service.
In planning, LoughPoint uses occupancy as a cap for live queues: Erlang C works out occupancy, and the cap only adds agents when the queue maths would run people above it. For email and back-office work, a planned occupancy converts workload into available time.
Offered occupancy (offered load ÷ available agents) is a different measure. It can exceed 100%, which signals demand above capacity rather than how busy people were. Use the offered occupancy calculator for that.
Worked example
These are the calculator’s example inputs; the results below are produced by the same function that runs the calculator above.
| Input | Value | Unit |
|---|---|---|
| Occupied handling time | 850 | hours |
| Available servicing time | 1000 | hours |
Result
- Occupancy
- 85 %
When this is wrong
- For chat, use the time agents were actually occupied, not the sum of overlapping chat durations, or occupancy can appear to exceed 100%.
- Do not apply an occupancy factor on top of an Erlang C requirement. The queue calculation already determines occupancy.
- Sustained very high occupancy leaves little recovery time between contacts and is hard to maintain across a shift. Agree a cap with operations rather than treating the highest figure as the most efficient.
Related calculators
- Interval offered occupancyCompare offered handling demand with available agent time.
- ShrinkageConvert an available requirement into a scheduled requirement.
- Erlang C calculatorSize available interval agents for service and occupancy constraints.
- Available hours after shrinkageFind time available for servicing after unavailable activities.
- Workload-based net FTEFind available FTE before allowing for shrinkage.
- Call centre staffing (FTE)Trace demand through workload, occupancy and shrinkage to roster size.
Definitions: metric glossary. How LoughPoint applies these methods to a full plan: methodology. All 50 calculators.
