Lesson 2 of 6 · 5 min read
Service level and waiting time
The idea in one line: service level is the share of customers answered within a target time, and each extra person makes a big difference when you are near the line.
Why it matters
Service level is the promise to your customers, and the number most managers ask about first. Understanding how it reacts to staffing stops two expensive mistakes: being one or two people short at the peak, and paying for people who sit idle.
How it works
- Service level = contacts answered within the target time ÷ contacts offered. "80/20" means 80% answered within 20 seconds. Decide once how you count abandoned calls, and keep it the same.
- Average speed of answer (ASA) = total waiting time ÷ contacts answered.
- Calls arrive at random, so even with enough people on average some callers will wait. The standard way to model this is the Erlang C formula. It tells you how many people you need for a given volume, handle time and target.
Worked example
Take 100 calls in a 30-minute slot, with a 5-minute AHT. That is 16.7 hours of work per hour, so at least 17 people just to keep up. Here is what Erlang C gives for an 80/20 target:
| People logged in | Answered within 20 seconds | Average wait | How busy each person is |
|---|---|---|---|
| 17 | 11% | 13 min 37 s | 98% |
| 18 | 39% | 2 min 30 s | 93% |
| 19 | 59% | 62 s | 88% |
| 20 | 73% | 30 s | 83% |
| 21 | 83% | 16 s | 79% |
| 22 | 89% | 9 s | 76% |
Going from 17 to 21 people (four more) takes the average wait from over 13 minutes to 16 seconds. 21 is the first number that meets 80/20.
Opening hours set a minimum
Erlang C works out the people needed for the contacts. Your hours of operation (HOOP) can need more. If the lines open at 7:00 and only a handful of calls arrive before 8:00, the formula may say one person is enough. You will still want a minimum on shift, often two, so that someone can take a break, handle a long or complex call, or cover sickness without the line closing.
Those minimums are staff over and above the workload, so they belong in the plan and the budget, not discovered on the day. Quiet edges of the day (early mornings, late evenings, weekends) are where they matter most.
Common mistakes
- Staffing to exactly the workload (17 here). On paper the work fits; in practice almost nobody is answered quickly.
- Averaging service level across the day. A great afternoon can hide a morning when customers waited ten minutes.
- Chasing 95%+ without seeing the cost: each extra percentage point near the top needs more people than the last.
Try it yourself
Erlang C calculator: enter calls, AHT and your target, and see how service level changes with each extra person.
In one sentence
You need more people than the raw workload, and the last few people are what turn long waits into a good service level.
