Lesson 1 of 6 · 5 min read
Demand and workload
The idea in one line: your plan starts with two numbers: how many contacts will arrive, and how long each one takes to handle. Multiply them and you have the work to be done.
Why it matters
Every later step (how many people, which shifts, when to take breaks) is built on this. If the demand is wrong, everything after it is wrong in the same direction.
How it works
- Volume is the number of contacts: calls, chats, emails or back-office items.
- Average handle time (AHT) is the full time one contact takes: talking, holding, and the wrap-up work after it.
- Workload is volume multiplied by AHT. Planners usually express it in hours.
Demand is never flat. It has a weekly shape (Mondays are often busiest) and a daily shape (a morning peak, a lunchtime dip). So we plan in short intervals, usually 15 or 30 minutes, not just per day.
Worked example
A team expects 1,200 calls on Monday, with an AHT of 5 minutes (300 seconds).
- Daily workload: 1,200 × 300 ÷ 3,600 = 100 hours of work.
- From history, the 10:00 to 10:30 slot gets about 3% of Monday's calls: 1,200 × 3% = 36 calls.
- Workload in that half hour: 36 × 300 seconds = 10,800 seconds, which is 3 hours of work in a 30-minute slot.
- 3 hours of work squeezed into half an hour means 6 people busy for the whole slot, before anyone waits or takes a break. Planners call this 6 Erlangs of traffic.
Chats, messages and concurrency
On chat and messaging, one person often handles several conversations at once. This is concurrency: 2 means two chats at the same time.
- Workload for concurrent channels = volume × AHT ÷ concurrency.
- But handling two at once usually makes each chat take longer, because the customer waits while the agent types in the other window. So the saving is real, but smaller than it looks.
Example: 240 chats a day.
| How chats are handled | Time per chat | Agent hours needed |
|---|---|---|
| One at a time | 8 minutes | 240 × 8 ÷ 60 = 32 hours |
| Two at a time | 12 minutes | 240 × 12 ÷ 60 ÷ 2 = 24 hours |
Concurrency saves 8 hours, a quarter, not the half you might expect from "two at once". Push concurrency too high and handle times climb further, customers wait longer for replies, and quality drops. Emails and back-office work are different again: they are not answered live, so they are planned to a response time measured in hours, which lets you smooth them into the quieter parts of the day.
Common mistakes
- Planning from a daily total and ignoring the intraday shape, which leaves the peak short and the quiet times overstaffed.
- Using talk time as AHT and forgetting hold and wrap-up.
- Treating every chat as a full person's time, or assuming that two chats at once halves the work.
Try it yourself
Workload calculator: enter your volume and AHT and see the hours of work.
In one sentence
Volume × handle time = workload, and the shape of that workload through the day matters as much as the total.
