Labour cost per contact from AHT calculator

Estimate contact labour cost from paid hourly cost and productivity assumptions. The formula is AHT ÷ (3,600 × concurrency) × paid hourly cost ÷ [occupancy × (1 − shrinkage)].

Coverage & costs · Planning assumption

Try the calculator

Estimate contact labour cost from paid hourly cost and productivity assumptions.

Use your active project

Upload data or load a sample in the workspace, then return here using the Calculation Library link. The project stays in memory during site navigation; a full refresh clears it. Save your private project before closing or refreshing.

ReferenceFormula

AHT ÷ (3,600 × concurrency) × paid hourly cost ÷ [occupancy × (1 − shrinkage)]

Calculator inputs

Your result

Estimated labour costCalculated
3.5014 currency/contact

Calculator baselines and manual scenarios do not change your planning project. Related workflow: Compare scenarios. The active project remains in browser memory during client navigation; full refresh clears it. Calculator edits stay in this page’s memory; only favourite calculator IDs are remembered in this browser. Downloads are created on your device.

How it’s calculated

Labour cost per contact from AHT = AHT ÷ (3,600 × concurrency) × paid hourly cost ÷ [occupancy × (1 − shrinkage)]

Inputs: average handling time (seconds/contact); loaded paid hourly cost (currency/hour); occupancy (%); shrinkage (%); effective concurrency (1 for single-contact work) (simultaneous contacts). Use consistent definitions for every input.

This is a planning estimate: an aggregate figure built on assumptions that should be checked against how your operation actually runs.

Worked example

These are the calculator’s example inputs; the results below are produced by the same function that runs the calculator above.

Example inputs
InputValueUnit
Average handling time300seconds/contact
Loaded paid hourly cost25currency/hour
Occupancy85%
Shrinkage30%
Effective concurrency (1 for single-contact work)1simultaneous contacts

Result

Estimated labour cost
3.5 currency/contact

When this is wrong

  • Uses effective concurrency; excludes fixed charges and non-labour costs.

Definitions: metric glossary. How LoughPoint applies these methods to a full plan: methodology. All 50 calculators.