Coverage & costs · Planning assumption
Overtime calculator: paid hours to close a staffing gap
When you are short of handling capacity, the overtime you pay for has to be more than the missing handling hours, because overtime hours also include idle time and some shrinkage. This calculator grosses the gap up: gap ÷ occupancy ÷ (1 − overtime shrinkage).
Coverage & costs · Planning assumption
Try the calculator
Estimate paid overtime needed for missing handling hours.
Use your active project
Upload data or load a sample in the workspace, then return here using the Calculation Library link. The project stays in memory during site navigation; a full refresh clears it. Save your private project before closing or refreshing.
ReferenceFormula
handling-hour gap ÷ [occupancy × (1 − overtime shrinkage)]
Calculator inputs
Your result
- Paid overtime neededCalculated
- 130.719 hours
Calculator baselines and manual scenarios do not change your planning project. Related workflow: Compare scenarios. The active project remains in browser memory during client navigation; full refresh clears it. Calculator edits stay in this page’s memory; only favourite calculator IDs are remembered in this browser. Downloads are created on your device.
How it’s calculated
Paid overtime to close a productive gap = handling-hour gap ÷ [occupancy × (1 − overtime shrinkage)]
Paid overtime = handling-hour gap ÷ [occupancy × (1 − overtime shrinkage)].
Start from handling hours, not FTE: overtime is booked in hours, and the gross-up only makes sense on the handling workload you are missing.
Overtime shrinkage is usually lower than normal shrinkage, because overtime blocks rarely include training or leave, but breaks and some lost time still apply. Use your own overtime figure.
To size the gap in the first place, compare required and available FTE with the FTE gap calculator, or required and scheduled agents for each interval with the net coverage calculator.
Compare the cost with the alternatives. Overtime is often paid at a premium, but it avoids recruitment and training costs and can stop when demand falls. Hiring costs less per hour once people are productive, but is slower to start and harder to reverse. The comparison depends on your own pay rates and contracts.
Worked example
These are the calculator’s example inputs; the results below are produced by the same function that runs the calculator above.
| Input | Value | Unit |
|---|---|---|
| Missing handling workload | 100 | hours |
| Occupancy | 85 | % |
| Overtime shrinkage | 10 | % |
Result
- Paid overtime needed
- 130.72 hours
When this is wrong
- Overtime only helps if it lands in the intervals that are short. A total that matches the gap can still leave the peaks uncovered.
- Take-up is voluntary in many contracts, and sustained overtime adds fatigue and cost.
- Working-time rules apply. In the UK, the Working Time Regulations set a 48-hour average weekly limit unless a worker opts out; in Ireland, the Organisation of Working Time Act sets a 48-hour average. Check contracts and local agreements with HR.
Related calculators
- FTE gapCompare the requirement with funded or available roster FTE.
- Net interval coverageIdentify excess or shortage of available agents.
- Agent-hour coverage ratioCompare scheduled and required available agent-hours.
- Call centre staffing (FTE)Trace demand through workload, occupancy and shrinkage to roster size.
- Attrition and hiring needEstimate whole-person hires needed to reach a target headcount.
- Monthly roster costEstimate the cost of a funded roster.
Definitions: metric glossary. How LoughPoint applies these methods to a full plan: methodology. All 50 calculators.