Staffing & shrinkage · Identity
FTE gap calculator: staffing surplus or shortfall
The FTE gap is available roster FTE minus required roster FTE. A negative figure is a shortfall to close through hiring, overtime or other changes; a positive figure is surplus capacity.
Staffing & shrinkage · Identity
Try the calculator
Compare the requirement with funded or available roster FTE.
Use your active project
Upload data or load a sample in the workspace, then return here using the Calculation Library link. The project stays in memory during site navigation; a full refresh clears it. Save your private project before closing or refreshing.
ReferenceFormula
available FTE − required FTE
Calculator inputs
Your result
- Net FTECalculated
- -60 FTE
Calculator baselines and manual scenarios do not change your planning project. Related workflow: Staffing Strategy. The active project remains in browser memory during client navigation; full refresh clears it. Calculator edits stay in this page’s memory; only favourite calculator IDs are remembered in this browser. Downloads are created on your device.
How it’s calculated
FTE gap = available FTE − required FTE
Net FTE = available roster FTE − required roster FTE.
Treat small gaps with care. Both figures are estimates, so a gap of a fraction of an FTE is usually within the error of the forecast and assumptions.
Both figures must use the same period, contract hours and shrinkage basis. Required FTE from the call centre staffing calculator already includes shrinkage, so compare it with contracted roster FTE, not with productive FTE.
A zero gap for a month can hide shortfalls at peaks and surpluses at quiet times. Check interval coverage before concluding that staffing is right.
Ways to close a shortfall include overtime, hiring after allowing for attrition, changing part-time hours or shift patterns, outsourcing some work, or agreeing a different service target. Each has a different lead time and cost.
Express the gap in the unit of the decision. Hiring decisions need people, so convert FTE to headcount at the contract mix you recruit. Overtime decisions need hours, so convert the shortfall into paid hours for the period: FTE × paid hours per FTE.
Worked example
These are the calculator’s example inputs; the results below are produced by the same function that runs the calculator above.
| Input | Value | Unit |
|---|---|---|
| Available roster FTE | 67 | FTE |
| Required roster FTE | 127 | FTE |
Result
- Net FTE
- -60 FTE
When this is wrong
- Negative means a shortfall. Both figures must use the same period, contract hours and shrinkage basis.
- A net figure does not show skills: surplus in one queue does not cover a gap in another unless the same people can do both.
- A gap measured today changes over the planning horizon as attrition, hiring, training and seasonal demand move. Track it by month rather than as one number.
Related calculators
- Call centre staffing (FTE)Trace demand through workload, occupancy and shrinkage to roster size.
- OvertimeEstimate paid overtime needed for missing handling hours.
- Attrition and hiring needEstimate whole-person hires needed to reach a target headcount.
- Net interval coverageIdentify excess or shortage of available agents.
- Headcount to FTENormalise part-time contracts into full-time equivalents.
- Monthly roster costEstimate the cost of a funded roster.
Definitions: metric glossary. How LoughPoint applies these methods to a full plan: methodology. All 50 calculators.
