To reach a target headcount by a date, hire the gap between that target and the people you expect to still have after attrition. This calculator applies an expected attrition rate over the planning window and rounds up to whole hires.

Coverage & costs · Planning assumption

Try the calculator

Estimate whole-person hires needed to reach a target headcount.

Use your active project

Upload data or load a sample in the workspace, then return here using the Calculation Library link. The project stays in memory during site navigation; a full refresh clears it. Save your private project before closing or refreshing.

ReferenceFormula

ceil(max(0, target people − current people × (1 − expected attrition)))

Calculator inputs

Your result

Expected retained peopleCalculated
90 people
Whole hires neededCalculated
20 people

Calculator baselines and manual scenarios do not change your planning project. Related workflow: Compare scenarios. The active project remains in browser memory during client navigation; full refresh clears it. Calculator edits stay in this page’s memory; only favourite calculator IDs are remembered in this browser. Downloads are created on your device.

How it’s calculated

Hiring need after expected attrition = ceil(max(0, target people − current people × (1 − expected attrition)))

Expected retained people = current people × (1 − attrition over the window). Hires needed = the target minus retained people, rounded up to whole people, and never below zero.

Rounding up matters: you cannot hire part of a person, so the hires needed are always a whole number even when the gap is fractional.

Attrition here is for the planning window, not necessarily a year. If you track annual attrition and plan for a shorter window, convert it first; for short windows, a pro-rata share of the annual rate is a reasonable approximation. The exact conversion is window attrition = 1 − (1 − annual)^(months ÷ 12).

The calculator counts people. If your requirement is in FTE, convert it to people for your contract mix with the FTE to headcount calculator first.

Hires are not productive on day one. Recruitment lead time, training and a period of reduced productivity after training mean the start date matters as much as the number.

Run the calculation for each month of a hiring plan rather than once for the year, so each intake starts training early enough to be productive when the requirement rises.

Worked example

These are the calculator’s example inputs; the results below are produced by the same function that runs the calculator above.

Example inputs
InputValueUnit
Current people100people
Target people110people
Expected attrition over the planning window10%

Result

Expected retained people
90 people
Whole hires needed
20 people

When this is wrong

  • Assumes hires are fully productive by the deadline. Add training time, nesting, hiring yield and part-time mix in a detailed plan.
  • Attrition among new starters can differ from attrition among established staff. If you have separate rates, use them.
  • Applies one attrition rate evenly; leavers often cluster at particular times of year.

Definitions: metric glossary. How LoughPoint applies these methods to a full plan: methodology. All 50 calculators.