Skip to content

Staffing & shrinkage · Planning assumption

Roster contact capacity calculator

Estimate contacts deliverable by a roster. The formula is FTE × hours/FTE × (1 − shrinkage) × occupancy × 3,600 × concurrency ÷ AHT.

Staffing & shrinkage · Planning assumption

Try the calculator

Estimate contacts deliverable by a roster.

Use your active project

Upload data or load a sample in the workspace, then return here using the Calculation Library link. The project stays in memory during site navigation; a full refresh clears it. Save your private project before closing or refreshing.

ReferenceFormula

FTE × hours/FTE × (1 − shrinkage) × occupancy × 3,600 × concurrency ÷ AHT

Calculator inputs

Your result

Contact capacityCalculated
34,272 contacts

Calculator baselines and manual scenarios do not change your planning project. Related workflow: Staffing Strategy. The active project remains in browser memory during client navigation; full refresh clears it. Calculator edits stay in this page’s memory; only favourite calculator IDs are remembered in this browser. Downloads are created on your device.

How it’s calculated

Roster contact capacity = FTE × hours/FTE × (1 − shrinkage) × occupancy × 3,600 × concurrency ÷ AHT

Inputs: roster FTE (FTE); paid hours per FTE in this period (hours/FTE); shrinkage (%); occupancy (%); AHT (seconds/contact); effective concurrency (1 for single-contact work) (simultaneous contacts). Use consistent definitions for every input.

This is a planning estimate: an aggregate figure built on assumptions that should be checked against how your operation actually runs.

Worked example

These are the calculator’s example inputs; the results below are produced by the same function that runs the calculator above.

Example inputs
InputValueUnit
Roster FTE30FTE
Paid hours per FTE in this period160hours/FTE
Shrinkage30%
Occupancy85%
AHT300seconds/contact
Effective concurrency (1 for single-contact work)1simultaneous contacts

Result

Contact capacity
34,272 contacts

When this is wrong

  • Aggregate workload capacity with effective concurrency; does not guarantee an SLA or interval coverage.

Definitions: metric glossary. How LoughPoint applies these methods to a full plan: methodology. All 50 calculators.